Built for earthworks,cubic metre by cubic metre.
Track zones, cells and plots from clearing to serviced — with the diesel, fill and plant behind every cubic metre.
Zones, cells & plots
See every plotat a glance.
An area site is laid out as zones, cells and plots; roads and drains run by chainage beside them. Daily logs move each plot through its stages, and the grid shows where the work really is.
- Cells and plots generated from a naming pattern
- Progress per plot, cell and zone — and per km of road
- Completion as a likely range per zone
Alaro Park Zone B · Cell 3
24 plots
- Cleared 6
- Cut & fill 8
- Compacted 5
- Services 3
- Serviced 2
- Cell 3 completion
- likely 5–26 Jan
- Plots complete
- 2 of 24
Stages
From bushto serviced plot.
Each unit moves through stages you configure. These are the template’s defaults.
-
S/1
Clearing
Setting out, clearing, grubbing and topsoil strip.
-
S/2
Cut & fill
Bulk cut, imported fill, haul and placing by layer.
-
S/3
Compaction
Layer by layer, with density tests logged.
-
S/4
Drains & roads
Lined drains, culverts and road base — by chainage.
-
S/5
Serviced
Plot pegged, levelled and handed over.
Materials
Diesel, fill and culverts,before they run short.
Norms per cubic metre turn the remaining quantities into material to complete. The site tank and the stockpile are stock on the ledger, so run-out is a range you can act on.
- Diesel per m³ and per machine hour
- Material to complete for each zone
- Run-out and reorder-by against supplier lead time
Material to complete · Zone B
| Material | On hand | To finish | Runs out |
|---|---|---|---|
| Diesel (l) | 9,500 | ≈38,000 | 4–6 d |
| Laterite fill (m³) | 2,100 | ≈7,400 | 3–5 d |
| Culvert rings (no.) | 36 | ≈120 | 12–15 d |
Run-out is a likely range at the 7-day weighted use
Plant on every zone
Know which machineis on which zone.
-
T/1
Fuel per machine hour
Every issue from the site tank is matched to the machine’s hours — and flagged when it burns outside its band.
-
T/2
Hours worked, idle, broken down
Daily logs record each excavator, dozer and tipper’s hours, pre-filled from yesterday’s plant.
-
T/3
Challenges by zone
Unsuitable material, groundwater and access problems are tagged by zone, so repeat issues are solved once.
Earthworks & land development template
What’s in the template.
Start from the template, then change what is different — with the same admin tools every customer gets.
-
Work items
- Clearing-to-services work item library
- Roads, drains and culverts by chainage
- Planned quantities per zone and layer
-
Norms & units
- Diesel, fill and cement norms per m³
- m³, m², loads, tonnes and litres
- Zone · cell · plot naming pattern
-
Daily log & lists
- Earthworks daily-log layout
- Plant hours worked, idle and broken down
- Delay causes: rain, fuel, breakdown, setting out
-
Plant & maintenance
- Excavators, dozers, graders, rollers, tippers
- 250 h / 500 h plans, km plans for tippers
- Fuel and meter logging per machine