Built for solar farms andmini-grids, block by block.

Track blocks, rows and tables from piling to energised — with the modules, cable and connectors behind every string.

Blocks, rows & tables

See every tableat a glance.

A solar plant is laid out as blocks, rows and tables; a mini-grid is a plant site with its distribution line. Daily logs move each table through its stages, and the grid shows where the work really is.

  • Rows and tables generated from a naming pattern
  • Progress per table, row and block — and per km of line
  • Completion as a likely range per block

Kano Park · Block C

24 tables

  • Piled 6
  • Tables 8
  • Modules 5
  • Strings 3
  • Energised 2
Block C completion
likely 5–26 Jan
Tables complete
2 of 24

Stages

From pileto energised.

Each unit moves through stages you configure. These are the template’s defaults.

  1. S/1

    Piling

    Survey, pegging, pile driving and pull tests.

  2. S/2

    Tables

    Tracker and table assembly, torque checks.

  3. S/3

    Modules

    Module mounting, clamps and earthing.

  4. S/4

    Strings

    DC cabling, MC4s, string tests and Voc.

  5. S/5

    Energised

    Inverter block commissioned and energised.

Materials

Modules, cable and MC4s,before they run short.

Norms per table turn the remaining tables into material to complete. Stock on hand comes from the stores ledger, so run-out is a range you can act on — against port clearance, not a supplier’s promise.

  • Consumption norms per table and string
  • Material to complete for each block
  • Run-out and reorder-by against port clearance

Material to complete · Block C

Material On hand To finish Runs out
Modules 550 W (pcs) 1,240 ≈3,960 6–8 d
MC4 pairs 820 ≈2,900 4–6 d
DC cable 6 mm² (m) 9,400 ≈21,000 12–15 d

Run-out is a likely range at the 7-day weighted use

Crews & sites

Know which crewis on which block.

  • T/1

    Crews you name

    Piling, mechanical, electrical and civil crews — your list and your names, set in the web admin.

  • T/2

    Crew by sub-contractor

    Daily logs record headcount by crew and sub-contractor, pre-filled from yesterday’s crew.

  • T/3

    Challenges by block

    Pile refusal, module breakage and cable theft are tagged by block, so repeat issues are solved once.

Solar & mini-grids template

What’s in the template.

Start from the template, then change what is different — with the same admin tools every customer gets.

  • Work items

    • Piling-to-energised work item library
    • Fencing, access roads, LV and MV lines
    • Planned quantities per block and site
  • Norms & units

    • Module, clamp, cable and MC4 norms per table
    • Pieces, strings, metres, kW and m³
    • Block · row · table naming pattern
  • Daily log & lists

    • Solar daily-log layout with QA photo slots
    • Crews and sub-contractors
    • Delay causes: customs, access, security, grid readiness
  • Plant & maintenance

    • Pile rigs, telehandlers, cranes and bowsers
    • Hours or calendar service plans
    • Fuel and meter logging per machine

Get started

Start with one block, free for 15 days.

Start on the Solar & mini-grids template in minutes, then add blocks and sites and invite your team. Or talk to sales for a guided setup.