Industries · Solar & mini-grids
Built for solar farms andmini-grids, block by block.
Track blocks, rows and tables from piling to energised — with the modules, cable and connectors behind every string.
Blocks, rows & tables
See every tableat a glance.
A solar plant is laid out as blocks, rows and tables; a mini-grid is a plant site with its distribution line. Daily logs move each table through its stages, and the grid shows where the work really is.
- Rows and tables generated from a naming pattern
- Progress per table, row and block — and per km of line
- Completion as a likely range per block
Kano Park · Block C
24 tables
- Piled 6
- Tables 8
- Modules 5
- Strings 3
- Energised 2
- Block C completion
- likely 5–26 Jan
- Tables complete
- 2 of 24
Stages
From pileto energised.
Each unit moves through stages you configure. These are the template’s defaults.
-
S/1
Piling
Survey, pegging, pile driving and pull tests.
-
S/2
Tables
Tracker and table assembly, torque checks.
-
S/3
Modules
Module mounting, clamps and earthing.
-
S/4
Strings
DC cabling, MC4s, string tests and Voc.
-
S/5
Energised
Inverter block commissioned and energised.
Materials
Modules, cable and MC4s,before they run short.
Norms per table turn the remaining tables into material to complete. Stock on hand comes from the stores ledger, so run-out is a range you can act on — against port clearance, not a supplier’s promise.
- Consumption norms per table and string
- Material to complete for each block
- Run-out and reorder-by against port clearance
Material to complete · Block C
| Material | On hand | To finish | Runs out |
|---|---|---|---|
| Modules 550 W (pcs) | 1,240 | ≈3,960 | 6–8 d |
| MC4 pairs | 820 | ≈2,900 | 4–6 d |
| DC cable 6 mm² (m) | 9,400 | ≈21,000 | 12–15 d |
Run-out is a likely range at the 7-day weighted use
Crews & sites
Know which crewis on which block.
-
T/1
Crews you name
Piling, mechanical, electrical and civil crews — your list and your names, set in the web admin.
-
T/2
Crew by sub-contractor
Daily logs record headcount by crew and sub-contractor, pre-filled from yesterday’s crew.
-
T/3
Challenges by block
Pile refusal, module breakage and cable theft are tagged by block, so repeat issues are solved once.
Solar & mini-grids template
What’s in the template.
Start from the template, then change what is different — with the same admin tools every customer gets.
-
Work items
- Piling-to-energised work item library
- Fencing, access roads, LV and MV lines
- Planned quantities per block and site
-
Norms & units
- Module, clamp, cable and MC4 norms per table
- Pieces, strings, metres, kW and m³
- Block · row · table naming pattern
-
Daily log & lists
- Solar daily-log layout with QA photo slots
- Crews and sub-contractors
- Delay causes: customs, access, security, grid readiness
-
Plant & maintenance
- Pile rigs, telehandlers, cranes and bowsers
- Hours or calendar service plans
- Fuel and meter logging per machine
Get started
Start with one block, free for 15 days.
Start on the Solar & mini-grids template in minutes, then add blocks and sites and invite your team. Or talk to sales for a guided setup.