Built for linear sites,kilometre by kilometre.
Progress by chainage, consumption per joint, plant on every spread — and a warning before the electrodes run out.
Chainage progress
Progress by chainage,not by guesswork.
Supervisors log chainage ranges — KP 4+200 → KP 4+450. SPADE draws the spread and shows what is done, in progress and blocked.
- Ranges checked against the route
- Overlaps rejected before they reach the ledger
- Gaps and blocked sections visible at a glance
Spread 3 · 12 km
35% laid
- Done
- Today
- Not started
- Blocked
- KP 0+000 → 2+300
- Done
- KP 2+300 → 2+450
- Gap · tie-in weld
- KP 4+350 → 4+560
- Today · in review
- KP 5+100 → 5+400
- Blocked · access
KP 4+300 → 4+500 overlaps an approved entry
Joints, welds & spreads
The units pipeline crewsactually count.
-
P/1
Spreads as sites
Each spread is a linear site with its own route, crew, stores and plant — rolled up to the project.
-
P/2
Metres, joints and welds
Log each activity in the unit the crew counts, converted for you.
-
P/3
Norms per joint
Electrode and coating consumption norms per joint drive run-out and material-to-complete projections.
Worked example
When do the electrodesrun out?
A generic 12 km spread, worked the way SPADE works it — every number traceable to approved logs.
- 1
Rate
4.2 km laid in 18 working days — about 233 m per day.
- 2
Remaining
7.8 km left of 12 km — about 33 working days at that rate.
- 3
Stock
Electrodes on hand cover about 9 days at the weighted daily use.
- 4
Lead time
14-day lead time: flagged today, with the quantity to finish.
Shortage risk
Medium confidence
Electrodes · 12 km spread
Runs out in likely 8–10 days
- Stock cover
- ~9 days
- Supplier lead time
- 14 days
- Work remaining
- ~33 working days
- Needed to finish
- ≈ 1,540 rods
Flagged today — five days before the order would be too late.
Plant on spreads
Service beforeit breaks.
Meter and fuel logs predict the next service by real usage — hours or calendar, whichever comes first.
- Sidebooms, welders, excavators and generators per spread
- Fuel per engine hour, faults and work orders
- 250 h, 500 h and 1,000 h plans with nested services
SB-04 · Sideboom
WorkingWhichever comes first → service due in likely 6–9 days
Pipeline template
What’s in the template.
Start from the template, then change what is different — with the same admin tools every customer gets.
-
Work items
- Clearing & grading, stringing, welding
- Coating, lowering-in, backfill & reinstatement
- Planned rates and quantities per spread
-
Norms & units
- Electrode and coating norms per joint
- m, km, joints, welds, rods, kg and litres
- KP chainage format and route ranges
-
Daily log & lists
- Pipeline daily-log layout
- Delay causes and challenge categories
- Weather, crew and HSE sections
-
Plant & maintenance
- Sidebooms, welders, excavators, generators
- 250 h / 500 h / 1,000 h nested service plans
- Fuel and meter logging per machine
Get started
Start with one site, free for 15 days.
Start on the Pipeline template in minutes, then add spreads and invite your team. Or talk to sales for a guided setup.