Built for linear sites,kilometre by kilometre.

Progress by chainage, consumption per joint, plant on every spread — and a warning before the electrodes run out.

Chainage progress

Progress by chainage,not by guesswork.

Supervisors log chainage ranges — KP 4+200 → KP 4+450. SPADE draws the spread and shows what is done, in progress and blocked.

  • Ranges checked against the route
  • Overlaps rejected before they reach the ledger
  • Gaps and blocked sections visible at a glance

Spread 3 · 12 km

35% laid

  • Done
  • Today
  • Not started
  • Blocked
KP 0+000 → 2+300
Done
KP 2+300 → 2+450
Gap · tie-in weld
KP 4+350 → 4+560
Today · in review
KP 5+100 → 5+400
Blocked · access

KP 4+300 → 4+500 overlaps an approved entry

Joints, welds & spreads

The units pipeline crewsactually count.

  • P/1

    Spreads as sites

    Each spread is a linear site with its own route, crew, stores and plant — rolled up to the project.

  • P/2

    Metres, joints and welds

    Log each activity in the unit the crew counts, converted for you.

  • P/3

    Norms per joint

    Electrode and coating consumption norms per joint drive run-out and material-to-complete projections.

Worked example

When do the electrodesrun out?

A generic 12 km spread, worked the way SPADE works it — every number traceable to approved logs.

  1. 1

    Rate

    4.2 km laid in 18 working days — about 233 m per day.

  2. 2

    Remaining

    7.8 km left of 12 km — about 33 working days at that rate.

  3. 3

    Stock

    Electrodes on hand cover about 9 days at the weighted daily use.

  4. 4

    Lead time

    14-day lead time: flagged today, with the quantity to finish.

Shortage risk

Medium confidence

Electrodes · 12 km spread

Runs out in likely 8–10 days

Stock cover
~9 days
Supplier lead time
14 days
Work remaining
~33 working days
Needed to finish
≈ 1,540 rods

Flagged today — five days before the order would be too late.

Plant on spreads

Service beforeit breaks.

Meter and fuel logs predict the next service by real usage — hours or calendar, whichever comes first.

  • Sidebooms, welders, excavators and generators per spread
  • Fuel per engine hour, faults and work orders
  • 250 h, 500 h and 1,000 h plans with nested services

SB-04 · Sideboom

Working
By hours likely in 6–9 days · 412 of 500 h
By calendar in 23 days · day 67 of 90

Whichever comes first → service due in likely 6–9 days

Pipeline template

What’s in the template.

Start from the template, then change what is different — with the same admin tools every customer gets.

  • Work items

    • Clearing & grading, stringing, welding
    • Coating, lowering-in, backfill & reinstatement
    • Planned rates and quantities per spread
  • Norms & units

    • Electrode and coating norms per joint
    • m, km, joints, welds, rods, kg and litres
    • KP chainage format and route ranges
  • Daily log & lists

    • Pipeline daily-log layout
    • Delay causes and challenge categories
    • Weather, crew and HSE sections
  • Plant & maintenance

    • Sidebooms, welders, excavators, generators
    • 250 h / 500 h / 1,000 h nested service plans
    • Fuel and meter logging per machine

Get started

Start with one site, free for 15 days.

Start on the Pipeline template in minutes, then add spreads and invite your team. Or talk to sales for a guided setup.