Industries · Roads & highways
Built for roads and highways,chainage by chainage.
Progress by chainage and layer, bitumen and aggregate per tonne laid, plant on every section — and a warning before the bitumen runs out.
Chainage progress
Progress by chainage,not by guesswork.
Section engineers log each layer by chainage — KP 4+200 → KP 4+450, wearing course. SPADE draws the section and shows what is done, in progress and blocked.
- Ranges checked against the section
- Overlaps rejected before they reach the ledger
- Gaps and blocked sections visible at a glance
Section 2 · 18 km
41% paved
- Done
- Today
- Not started
- Blocked
- KP 0+000 → 7+400
- Done
- KP 7+400 → 7+650
- Gap · culvert 14
- KP 7+650 → 8+100
- Today · in review
- KP 9+200 → 9+600
- Blocked · right of way
KP 7+600 → 7+900 overlaps an approved entry
Layers, tonnes & sections
The units road crewsactually count.
-
P/1
Sections as sites
Each section or lot is a linear site with its own chainage, crew, stores and plant — rolled up to the project.
-
P/2
Cubic metres, tonnes and metres
Earthworks in m³, base in m³, asphalt in tonnes, drains in metres — each layer in the unit the crew counts.
-
P/3
Norms per tonne and per metre
Bitumen per tonne of asphalt, aggregate per m³ of base and cement per m³ of concrete drive run-out and material-to-complete.
Worked example
When does the bitumenrun out?
A generic 18 km section, worked the way SPADE works it — every number traceable to approved logs.
- 1
Rate
7.4 km of wearing course in 31 working days — about 240 m per day.
- 2
Remaining
10.6 km left of 18 km — about 44 working days at that rate.
- 3
Stock
Bitumen on hand covers about 26 days at the weighted daily use.
- 4
Lead time
21-day import lead time: flagged today, with the tonnes to finish.
Shortage risk
Medium confidence
Bitumen · 18 km section
Runs out in likely 24–28 days
- Stock cover
- ~26 days
- Supplier lead time
- 21 days
- Work remaining
- ~44 working days
- Needed to finish
- ≈ 430 t
Flagged today — five days before the order would be too late.
Plant on sections
Service beforeit breaks.
Meter and fuel logs predict the next service by real usage — hours or calendar, whichever comes first.
- Pavers, rollers, graders and tippers per section
- Fuel per engine hour, faults and work orders
- 250 h plans for plant, 10,000 km plans for tippers
PV-02 · Paver
WorkingWhichever comes first → service due in likely 6–9 days
Roads & civil works template
What’s in the template.
Start from the template, then change what is different — with the same admin tools every customer gets.
-
Work items
- Clearing, earthworks, sub-base and base
- Prime, binder and wearing course, drains, culverts
- Planned rates and quantities per section
-
Norms & units
- Bitumen, aggregate and cement norms per tonne and m³
- m, km, m², m³, tonnes, bags and litres
- KP chainage format, carriageway and layer
-
Daily log & lists
- Road daily-log layout
- Delay causes: rain, bitumen stock-out, quarry, right of way
- Weather, crew and HSE sections
-
Plant & maintenance
- Pavers, rollers, graders, tippers, bitumen distributors
- 250 h / 500 h / 1,000 h nested service plans
- Fuel and meter logging per machine
Get started
Start with one section, free for 15 days.
Start on the Roads & civil works template in minutes, then add sections and invite your team. Or talk to sales for a guided setup.