Industries · Water mains & canals
Built for mains and canals,metre by metre.
Progress by chainage, pipe by diameter, plant on every scheme — and a warning before the pipe runs out.
Chainage progress
Progress by chainage,not by guesswork.
Supervisors log chainage ranges — KP 4+200 → KP 4+450, 600 mm DI. SPADE draws the main and shows what is laid, tested and blocked.
- Ranges checked against the route
- Overlaps rejected before they reach the ledger
- Gaps and blocked sections visible at a glance
Main 1 · 12 km
35% laid
- Done
- Today
- Not started
- Blocked
- KP 0+000 → 2+300
- Done
- KP 2+300 → 2+450
- Gap · chamber 7
- KP 4+350 → 4+560
- Today · in review
- KP 5+100 → 5+400
- Blocked · groundwater
KP 4+300 → 4+500 overlaps an approved entry
Pipes, chambers & schemes
The units pipe crewsactually count.
-
P/1
Mains as sites
Each transmission main or canal reach is a linear site with its own route, crew, stores and plant — rolled up to the scheme.
-
P/2
Metres by diameter, joints and chambers
Pipe laid in metres by diameter, joints, chambers and house connections — each in the unit the crew counts.
-
P/3
Norms per metre
Pipe, bedding sand and cement norms per metre drive run-out and material-to-complete projections.
Worked example
When does the piperun out?
A generic 12 km main, worked the way SPADE works it — every number traceable to approved logs.
- 1
Rate
4.2 km laid in 18 working days — about 233 m per day.
- 2
Remaining
7.8 km left of 12 km — about 33 working days at that rate.
- 3
Stock
600 mm DI pipe on hand covers about 33 days at the weighted daily use.
- 4
Lead time
28-day import lead time: flagged today, with the metres to finish.
Shortage risk
Medium confidence
600 mm DI pipe · 12 km main
Runs out in likely 31–35 days
- Stock cover
- ~33 days
- Supplier lead time
- 28 days
- Work remaining
- ~33 working days
- Needed to finish
- ≈ 7,900 m
Flagged today — five days before the order would be too late.
Plant on schemes
Service beforeit breaks.
Meter and fuel logs predict the next service by real usage — hours or calendar, whichever comes first.
- Excavators, dewatering pumps, compactors and cranes per scheme
- Fuel per engine hour, faults and work orders
- 250 h, 500 h and 1,000 h plans with nested services
DP-03 · Dewatering pump
WorkingWhichever comes first → service due in likely 6–9 days
Water & drainage template
What’s in the template.
Start from the template, then change what is different — with the same admin tools every customer gets.
-
Work items
- Trenching, bedding, pipe laying by diameter
- Jointing, chambers, hydrotest, backfill & reinstatement
- Planned rates and quantities per main
-
Norms & units
- Pipe, bedding and cement norms per metre
- m, km, m³, joints, chambers, bags and litres
- KP chainage format and route ranges
-
Daily log & lists
- Water & drainage daily-log layout
- Delay causes: groundwater, rock, right of way, pipe delivery
- Weather, crew and HSE sections
-
Plant & maintenance
- Excavators, pumps, compactors, fusion machines, tippers
- 250 h / 500 h / 1,000 h nested service plans
- Fuel and meter logging per machine
Get started
Start with one main, free for 15 days.
Start on the Water & drainage template in minutes, then add mains and invite your team. Or talk to sales for a guided setup.